Skip to main content

Posts

Showing posts from October, 2024
  Steps for Open Well Construction Open well construction is a traditional and effective method for harvesting groundwater, providing a sustainable water source for households. The construction steps are very important because they determine if the well works for a long time and can be of benefit. Here’s a step-by-step guide for building an open well: Selection of Site Choosing the right location is crucial. The site should be away from any septic tank or wastewater disposal area to avoid contamination. A geological survey can determine the soil condition and water table depth.  Excavation Once the site has been selected, excavation begins either manually or through machinery. The well is drilled to a depth of 10-20 meters, depending upon the depth of the water table and the conditions prevailing in the locality. Circular wells are common in Kerala due to their structural stability.  Lining the Well Upon attainment of desired depth, the walls are lined up with bricks, stones or reinfor